Changeset 214

Show
Ignore:
Timestamp:
06/24/08 12:08:06
Author:
jcothran
Message:

--

Files:

Legend:

Unmodified
Added
Removed
Modified
Copied
Moved
  • docs/usc/docs/jcothran_secoora_plan_1.txt

    r213 r214  
    110110        status - waiting some for any final tweaks in design process on DIF side and validation test via CSC before moving forward 
    111111 
     112RENCI interaction ? 
     113        status - renci is pulling Secoora obs via ObsKML into the ODM database 
     114 
     115other obs of opportunity ? 
     116        vembu - tampa area hf radar 
     117        adcp bin currents, graphs 
     118        hf radar - wave height 
     119         
     120 
    112121==implement 
    113122